Skip to content

Support large application assignment graphs and verified package environments - #306

Merged
mdspinali merged 26 commits into
devfrom
app-assignment-capacity
Oct 4, 2026
Merged

mdspinali merged 26 commits into
devfrom
app-assignment-capacity

Conversation

@mdspinali

@mdspinali mdspinali commented Oct 4, 2026 •

Copy link
Copy Markdown
Contributor

The application requires more than 1,000 dynamic assignments for its approved offline dependency graph. This change permits an administrator-selected unbounded limit. It preserves the default limit of 1,000, bounded overflow rejection, and authorization checks.

The branch prepares the next candidate and verifies actual package environments against sealed records. Server, Apple, Kotlin, and React Native consumers compare initial and resume environments. Android preparation supports API 24, preserves the selected local device, and completes preparation before parallel smoke prerequisites. Android consumers bound device calls and control resume launch.

Validation includes fresh installation, three upgrade origins, 434 Rust tests, and a 1,004-scope protocol lifecycle. The retained integration run passed 626 tests with no failures or skips. Final Android source checks passed 86 tests and 12 timeout and signal controls. An independent review accepted the complete 26-commit, 106-file range at 1b89c87fc31cb00690dc909a5fc04edc06177328.

Exact-head PR CI run 37237129124 passed source quality, Swift unit tests, CodeQL, dependency scanning, and the required pull-request aggregate. Candidate jobs are push-only and did not run on this PR.

Development integration does not establish release acceptance. Exact promoted Candidate CI, current-platform verification, seven sealed Package cells, publication approval, and Public verification remain required. No application dependency change follows from this merge.

Tracks #300, #301, #302, and #298. Supports trainstar/app#4. These issues retain their separate acceptance criteria.

@mdspinali
mdspinali marked this pull request as ready for review October 4, 2026 22:01
@mdspinali
mdspinali merged commit 2c5ae52 into dev Oct 4, 2026
19 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant