Skip to content

Latest commit

 

History

History
20 lines (13 loc) · 2.74 KB

File metadata and controls

20 lines (13 loc) · 2.74 KB

90-day plan · interim progress report

As of 2026-10-11. This is an interim report prepared early, not a completed 90-day retrospective. The final report remains pending until the reporting period has actually elapsed. Read the dated evidence rather than treating the plan's stage names as elapsed time.

Published work and evidence

Limits and unfinished work

No verified independent feedback, repeat-use study or received outside contribution. Followers remain four in the snapshot. All four showcase repositories show zero stars and forks. No donation amount or confirmed payment destination is claimed.

Actual touch-device testing, independent first-use feedback, a release based on that feedback, upstream human review and verified financial-support eligibility remain open. Public Pages reachability encountered a DNS failure in the last in-app-browser article check despite successful deployment; use the repository documents and reproducible CLI if needed.

For the final report, preserve this snapshot, then compare real dated changes, resolved issues, authentic feedback, reviews and maintenance time. Do not count drafts as merged work or projections as outcomes. All these implementations and this report were prepared with AI assistance.