Support graceful runner drain before orchestrator pod upgrades #23
The sandbox allocator must drain an orchestrator and its app runners before an orchestrator-pod upgrade. The agreed maintenance window allows active work up to 12 hours. Today Registry.usable requires Status == "ready" and is used both for new reservations and for sessionTarget / proxyTarget. Changing a runner's status to withdraw capacity therefore also breaks new requests on existing persistent sessions and generated proxies. The trusted sandbox adapter will update status and capacity through Node's heartbeat protocol directly; no Go SDK status/capacity API is required for the first sandbox path.
Separate admission/discovery readiness from service of already admitted sessions. Provide a trusted way for a dynamic runner or local manager to enter and observe draining state without giving an app container runner credentials.
During drain, reject new persistent reservations and single-shot calls, while existing persistent session proxies/callbacks and already in-flight single-shot requests continue within their established limits.
Define a configurable drain deadline that supports a 12-hour grace period. On completion or deadline, release/cancel remaining sessions and report the outcome. Explicit forced termination remains possible under authorized management.
Ensure paid and off-chain paths use the same admission rule; a rejected paid reservation must not charge or consume a ticket.
Document what happens when the orchestrator process crashes or is forcibly restarted: its session/payment control state is currently process-local, so graceful drain must finish before a planned pod replacement.
Done when
Tests demonstrate both session modes, existing proxy continuity during drain, rejection of new work, deadline cancellation, and a planned orchestrator upgrade that waits for drain completion or the 12-hour limit. The node exposes enough state for the local manager to tell whether it is safe to replace the pod. Integration tracking: naap-ops #94 and #92.